Met with client on Audio Visual requirements for the conference rooms.
Sent facilities Design Drawings comments for review
Met with the Network Engineers, Telephone and Cabling groups to review cable tray layout, phone locations, fiber amounts, copper amount, telecomm layout, and rack elevations.
Informed the NE group about the ITV group having there I/O panel on the IDF wall in the hallway and that the panel would protrude into the IDF. The NE are fine with the panel.
Update the communication log and reviewing the vendor drawings and last meeting notes.
Requested a status from the vendor on the estimated infrastructure quote.
Working with NE to have drawings for rack elevations to hand off to the architects.
Thursday, June 10, 2010
Thursday, June 3, 2010
Progress Update
Met with client on Audio Visual requirements for the conference rooms.
Sent facilities Design Drawings comments for review
Met with the Network Engineers, Telephone and Cabling groups to review cable tray layout, phone locations, fiber amounts, copper amount, telecomm layout, and rack elevations.
Informed the NE group about the ITV group having there I/O panel on the IDF wall in the hallway and that the panel would protrude into the IDF. The NE is fine with the panel.
Follow up on rack elevation design from the network engineers.
Follow up with the vendor on the infrastructure quote.
Sent facilities Design Drawings comments for review
Met with the Network Engineers, Telephone and Cabling groups to review cable tray layout, phone locations, fiber amounts, copper amount, telecomm layout, and rack elevations.
Informed the NE group about the ITV group having there I/O panel on the IDF wall in the hallway and that the panel would protrude into the IDF. The NE is fine with the panel.
Follow up on rack elevation design from the network engineers.
Follow up with the vendor on the infrastructure quote.