Friday, April 30, 2010

Progress Update

Met with the Media resource group to review and discuss LCD locations.
Responded to some IT questions from architects to keep the project moving forward.
Preparing a presentation for an overall view of the project for Information Technology.
The April 28th meeting with Network Engineers is to review the telecomm design and layout.
Review DD specification.
Review the DD drawings.
A meeting has been setup with client to review their AV requirements for the conference room.
Follow up on the clients request for LCD locations, SIWS,and video conferencing request for both rooms.
Setup meeting with ITV to review and discuss their IT requirements.

Friday, April 16, 2010

Progress Update

A biweekly programming meeting by facilities, Architects, and engineers met to review and discuss designs for the building. The meetings are a minimum of 2 hours.
Met with facilities and vendor discussing the impact of emergency power changes to SE and CS. There continues to be discussion and planning on this subject.

Meet with ITV to review and confirm their IT requirements. Another meeting will need to take place with the ITV to confirm their fiber requirements.
Met with network services to review telecomm design, fiber count, and infrastructure devices.

Working with facilities and architects in responding to IT questions related to media resources equipment and telecom closets.

A new design for the two of the math labs is being discussed there should be no impact on the infrastructure design.

An overview of the project is scheduled with IT team to review estimated timeline and IT services required to operate the building.

A follow meeting is scheduled for April 28th with the NE group on their design for the telecomm closet rack to calculate the amount of space for each closet rack to calculate the amount of space for each closet will meet the IT requirements for each floor of the building.

Thursday, April 1, 2010

Progress update

•Biweekly programming meetings continue. The last meeting reviewed and discussed IT related designs and changes. An hour and half was spent reviewing ITV connectivity for the building.
•Updated AV specifications were forwarded to design team.
•A meeting is scheduled with the AV group to discuss the LCD locations.
•Working with the network service group in determining the rack layouts.
•Following up with the facilities group on the workstation count.
•Preparing a meeting to discuss ITV locations and their requirements. A meeting was previously held with facilities on potential ITV locations.