Reviewed the 95% constructions drawings with FIP group on Jan 5th and 6th.
Met with ITV ton January 11th to review ITV locations and confirm the locations are accurate.
A 95% construction drawing on board meeting was done on January 14th to review comments.
A meeting to review the final CD 95% comments and checklist is scheduled for January 18th.
Met with the Media Resources group and vendor to review the 95% construction drawings for their equipment location, design, and AV construction drawings.