- New Program Summary Draft
- Classrooms (32 seat)
- Classrooms (48 seat)
- Lecture hall
- Math lab (small & large)
- Conference room (small & large)
- MSC Group Study
The above documents should be available on the Burt Hill site.
SIWS
- Explanation given about differences between tier 1 and tier 2
- Tier 1 should be used for design development purposes
- Standards being reviewed - should be ready by July
- Faculty prefer to have stand alone DVD player separate from DVD in PC / laptop
- Moving to 16x10 screens - can tailor lense to the room - standards to be passed on to Burt Hill
- Eventually VHS will go away
- Plan to use Sympodium instead of smart white board
- Need to provide a cable connect (coax) to each location even if not connected
- Need phone by each SIWS
- Need screen up/down switch by the SIWS
- Screen should be recessed in the ceiling
- Screen should be in the center of the room or just off center
- Remote pointers / advancers to be distributed to the faculty using the room
- Standard for connections is thru the floor
- Want station on the other side of the room from the door so that students who are late don't walk in front
- Can be slightly angled
- Document camera should be positioned on the side closest to the side wall
- Speakers are ceiling mounted (70 volt ) with 6 per room
- All equipment needs to be on the same electrical circuit (20 amp dedicated) to prevent ground loops
- Projector standard is currently 720i
- There was a question whether Sympodium will adjust for a 16x10 screen.
Data / voice / cable television
- Standards should be updated by July and should be reviewed every 14 months
- Standard for horizontal cable TV is currently RG6 but may be replaced by fiber in the new set of standards
- There should be a BDF / MDF for each building (200 sq ft)
- There should be one or more IDFs for each floor (150 sq ft) depending on the positioning within the building that allows for the 295 foot maximum length of cabling.
- Intelligent building cables should use cat-6 and may be terminated in the MDF/s IDFs. This does not apply to fire alrams.
- There will be a loop going thru Science Science east and Science West.
Wireless
- Intention is to provide unsecured wifi access to the internet and secured access via wifi to MC resources. This decision is still in committee.
- Will need to provide power points in the floor for charging laptop batteries
- Wireless Access Points will be POE and will be mounted in the plenum
- A wireless study is not included in the contract with Burt Hill
Digital signage
- This will depend on the programming needs of the building
- Will mostly be installed in lobby areas, not in classrooms
- Currently being looked at by a committee
- Displays need to be positioned so that blind people do not walk into them (ADA)
Mobile carts / storage
- Need to be provided to quickly replace a failed SIWS
- These will need to cover the Science building as well as E/W - three storage spaces, one per building - could be combined for Science and Science East in a double sized room
- Need 2 stations per building (6 total)
- Storage requirements per building, 2 stations, (6' x 2') shelf space, shelving for 5 CPUs
- Nothing special required for electrical
- Should be network access and a phone
- Technicians will work in the rooms but not require desk space
- No other special devices that need a home
- A/V recording - ITV truck - provisioning made to allow for connecting ITV cables to truck in Science. Similar provisioning should apply to East and West
Digital White Board
- Will use Sympodium and project screen
- Burt Hill will not provide demos of other possiblities
- Education lab that currently uses a Promethian board will not be in East or West and will be relocated elsewhere
Emergency notification
- standards being developed
- BH will specify amber colored stobes and LCD panels that are tied back to the fire alarm system
Clocks
- Possibly atomic with a repeater within the buildings
- To be decided by Facilities
Review by Program Area
- Examples of how to plug in power and network cables at desktops were discussed.
- Expect increased demand for power points for recharging laptops and cellphones
- Concerns expressed by faculty about durability of sockets.
Classrooms (32 and 48 seat versions) - see document at BH site
- No fixed PCs in these rooms
- Provide for laptops that students bring in or from a roll around cart
- Telephone for all rooms (irrespective of whether there is a SIWS or not)
- One power outlet per seat
- SIWS is not a KI furnishing
Lecture Hall - see document at BH site
- Probably reusing the hall in Science West
- No digitized wall board
- No TV
- One LCD projector - lense size to fit room dimensions - line of sight issues - existing screen is too large
- Could use a roll around whiteboard
- Provide power for laptops at each seat
- Need for Video Conferencing to be identified by Dean
- Provide telephone near SIWS
- SIWS to have movable head on document camera to allow for easy positioning over experiments
- May need sound reinforcement
- ADA hearing needs covered by Disability Services
- May need to provide ability to record (auxiliary connectors on SIWS for video / audio)
- Possible surround sound to show movies.
Conference rooms (small and large) - see document at BH site
- No screen for small room - use 57" LCD
- No SIWS for small room
- Use companion cart with laptop locked on top in small room
- Screen and SIWS for large room
- Need for Video Conferencing to be identified by Dean for both rooms
- Locations of rooms not yet determined
Math / Science PC labs - see document at BH site
- 1 network printer per room
- May have special PC hardwre requirements for Pro Engineering software
- May need 2 SIWS if the long narrow version of the large lab (option 1) is used. Only need 1 SIWS if option 2 chosen.
MSC Group Areas
- no discussion
MSC Special Areas
- no discussion
Typical Administrative Areas
- 1 PC and 1 printer per office - use standard office configuration for Science Center
OIT Areas
- Need offices for network and Media resources staff
- Server room should be adjacent to MDF (200 sq ft)
- Staging and repair - lower level desirable (500 sq ft) - see student services programming